Renovation Permit

This service can be used to obtain an approval for the installation of fixtures and and repairs on existing structures of operating tourist facilities. Maintenance work includes rethatching the roof, deck and roof repairs, painting, electrical repairs and other required maintenance works.

Responsible Entity: Ministry of Tourism

Sign in to apply for services.

After signing in, you can start with the form application selected.

Apply for Renovation Permit

Eligibility

All submissions should be made by the Head-Lessee, Sub-Lessee, or Assignee through delegation.

How to Apply

  • You can apply using an Efaas account.

  • Logging into your own account will direct you to the OneGov homepage.

Documents Required

  • Project brief (project name, introduction, site, details, equipment & method, schedule)

  • Work schedule/ Plan

  • Detail Drawings (if applicable)

After you Apply

  • After successful submission, a notification will be sent to your email and phone. 

  • You can check the status of the request from the “My Applications” tab.

  • Once the application is processed, the renovation and upgrading permit will be issued via email.

Estimated Time Frame

All duly completed applications will be processed within 14 days.

FAQs

What is eFaas and how can I create an eFaas account?

eFaas is the most common account used by individuals for transactions with various e-Government services online. Any Maldivian with a valid National ID Card can use eFaas to login. To create an eFaas account, sign up at http://efaas.egov.mv/Account/Verify or alternatively, visit http://efaas.egov.mv/ and click to create an account.  Enter your ID card details. The serial number of your ID card can be found on the back of the card. If you have an existing account, you can sign in directly. If you have forgotten the password to your account, you may click on forgot password and reset your account from the link: http://efaas.egov.mv/Account/ForgotPassword 

What type of renovation or maintenance works require detailed drawings to be submitted?

If the proposed works include internal refurbishments that require bringing changes to the approved detailed drawings.

What information should be included in the project brief?

Applicants shall follow the template given in the attached guideline document for details on what needs to included in the project brief (scope of work).

Need more help?

Talk to an agent

If you have a problem and require assistance call 1500 right away, or schedule a call with a oneGov support agent.

Connect online
oneGov logo
Visit a Support Center

If you need face-to-face interaction visit any of our Support Centers for personalized support and assistance.